水平井堵水用油层暂堵保护液的制备及性能
DOI:
作者:
作者单位:

海洋油气高效开发全国重点实验室

作者简介:

通讯作者:

中图分类号:

TE357.4????

基金项目:

国家自然科学基金项目(面上项目,重点项目,重大项目)-2023YFB4104200-CO2驱油及封存安全监测


Preparation and properties of reservoir temporary plugging protection system for horizontal well water plugging
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    海上油田特高含水水平井占比较高且堵水成功率低、易出现油水同堵的问题,为提高水平井堵水成功率,优选Span80、AES和CAB为乳化剂,1700万分子量的抗盐聚合物为稳定剂,制备了一套油层暂堵保护液。通过分子动力学模拟与室内实验相结合的方法,筛选并优化了暂堵保护液中乳化剂和稳定剂的种类及其使用浓度,乳化暂堵保护液的最优配方为:3%乳化剂(Span80:AES:CAB=8:1:1)+0.2%聚合物(1700万抗盐聚合物)。通过分液时间法和一维填砂管模型对暂堵保护液的性能进行了测试,结果表明,该体系在高温高盐条件下具有良好的乳化稳定性,4d内无析液现象;良好的油水选择性和渗透率恢复能力。该暂堵保护液在渗透率级差小于4、注入速度为2.0mL/min条件下,能有效实现液流转向,油层暂堵保护效果显著。该研究为海上油田水平井堵水作业中油层保护提供了理论依据和技术支持。

    Abstract:

    The proportion of ultra-high water-cut horizontal wells in offshore oilfields is relatively high.? And due to the problem of oil-water co-plugging, the success rate of water plugging is very low. In order to improve the success rate of water plugging in horizontal wells, a reservoir temporary plugging protection system was prepared using Span80, AES and CAB as emulsifiers, and the 17 million molecular weight salt-resistant polymer was used as stabilizer.The types and concentrations of emulsifiers and stabilizers in the temporary plugging protection system were determined through molecular dynamics simulation and laboratory experiments. The optimal preparation condition for the temporary plugging protection system were: 3% emulsifier ( Span80:AES:CAB = 8:1:1 ) + 0.2% polymer ( 17 million salt-resistant polymer ). The performance of the temporary plugging protection system was tested by liquid separation time method and one-dimensional sand filling tube model. The results showed that this system had good emulsification stability that no drninage phenomenon within 4 days, oil-water selectivity and permeability recovery ability under high temperature and high salt conditions. And the temporary plugging protection system effectively realized the liquid flow diversion under the permeability difference was less than 4 and the injection rate was 2.0mL/min. In general, the temporary plugging protection effect of the oil layer is remarkable. This study provides theoretical basis and technical support for reservoir protection in offshore oil horizontal well water plugging operation.

    参考文献
    相似文献
    引证文献
引用本文
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期: 2026-02-27
  • 最后修改日期: 2026-04-28
  • 录用日期: 2026-06-01
  • 在线发布日期:
  • 出版日期:
点击这里给我发消息

点击这里给我发消息